
Lethabo solar plant (South Africa)

Details of Project
First ever solar plant connected to the grid in all Africa
- Lluis Torrent, ABB Global Solar Centre of Competence
- Customer: South Africa government, ESKOM utility
- Capacity: 0.5 MWac / 0.66 MWdc, 1-axis tracker
- Period: 72 days (from design to commissioning)
- Year: 2011